Waterproofing
Bathroom Waterproofing
Leak-proof bathrooms that protect adjoining walls and the floor below.
The problem
Hidden bathroom leaks travel into shared walls and the ceiling beneath, causing damp patches, peeling paint, and costly repeated repainting.
Our solution
We waterproof the wet zone end to end — sunken floor, junctions, and walls up to splash height — with the right membrane and slope to the drain, before tiling.
Benefits
What you get
- Protects adjoining bedrooms and the floor below
- Prevents efflorescence and paint peeling on shared walls
- Correct slope eliminates standing water
- Done before tiling for a lasting, hidden seal
Process
How we deliver it
- 1
Inspection
Locate damp sources around the wet zone and shared walls.
- 2
Prep & slope
Repair the sunken slab and set the correct fall to the drain.
- 3
Membrane
Apply waterproofing to floor, junctions, and walls to splash height.
- 4
Flood test
Confirm zero leakage before tiling and finishing.
Expected timeline
2–4 days per bathroom (excluding tiling).
Ideal for
Homeowners with damp on shared bathroom walls, or anyone renovating a bathroom and wanting it done right.
FAQ
Bathroom Waterproofing questions
Related
You might also need
Wall Seepage Treatment
Treat damp walls at the cause — not with another coat of paint.
Mould Removal & Prevention
Remove mould safely and stop it coming back.
Structural & Surface Crack Repair
Diagnose and repair cracks before they become leaks or weaknesses.