House Construction
A house construction contractor who stays accountable after handover
One team for structure, masonry, plumbing, electrical and finishing, with an itemised BOQ, stage-wise checks and a 10-year warranty on all work.
Choosing a contractor is the decision that shapes everything else: your budget, your timeline and how long your house lasts. Most families pick on price per square foot, then discover the missing items, substitute materials and vanishing labour later.
RennovEN works differently. You get one written scope, a line-by-line bill of quantities, payments tied to finished milestones, and a contractor who is still answerable to you for 10 years after you move in.
Signs you need this
- Quotes that differ wildly with no breakdown
- Contractor will not commit to brands of cement or steel
- Payment demanded in advance, not by milestone
- No written timeline or penalty for delays
- No warranty offered once the house is handed over
The RennovEN promise
- 10-year warranty on all works
- Itemised pricing, approved before work begins
- One accountable team across every trade
- Residential specialists — homes only
Diagnosis
Why it happens
Lump-sum per-sq-ft quotes
A single rate hides what is included. Plastering grade, tile size, wiring gauge and fittings are all left vague, so costs grow mid-way.
Labour-only thekedars
Many local contractors supply labour but not engineering. Nobody checks shuttering, steel spacing or curing before concrete is poured.
No accountability after handover
Once the last payment clears, cracks, seepage and electrical faults become the owner’s problem.
Our method
How RennovEN does it
- 1
Site & brief
Plot inspection, soil observation, family needs and budget discussion.
- 2
Drawings & BOQ
Architectural and structural drawings plus an itemised bill of quantities.
- 3
Build with checks
Foundation, columns, slabs and services checked against our checklist at every stage.
- 4
Handover
Snag list closed, as-built details shared and your 10-year warranty certificate issued.
What’s included
- Project manager and site engineer for your home
- Itemised BOQ with material brands recorded
- Milestone-linked payment schedule
- Weekly photo progress updates
- Written warranty certificate at handover
What affects the cost
- Built-up area and number of floors
- Soil condition and foundation type
- Structural design (spans, cantilevers, basement)
- Material and finish specification you choose
- Site access, water and power availability
Every home is different, so we don’t publish rate cards. After a free inspection you get an itemised estimate, and you approve every line before work begins.
Get my itemised estimate10-year warranty
All construction work we execute — RCC, masonry, plaster, plumbing, electrical, flooring and finishing — is covered against workmanship defects for 10 years from handover.
How our warranty worksFAQ
House Construction Contractor: your questions
Related
You might also need
Home Construction
Residential house construction by RennovEN — independent houses, villas, duplexes, G+1/G+2 homes and floor additions with itemised BOQ pricing, stage-wise quality checks and a 10-year warranty.
ExploreTurnkey House Construction
We handle design, structure, finishing, fittings and interiors so you receive a complete, ready-to-live home, backed by a 10-year warranty.
ExploreConstruction Quality Inspection
Building with another contractor? Our engineers check steel, concrete, masonry and services at critical stages, so mistakes are caught before they are buried.
Explore